Clear Choice Medical Headquarters
Bend, OR – Completed 4/2008
Owner’s Rep :Roger Frei
AV Project Value Approx: $150,000.00
AV Systems Designer – Delta AV
General Contractor – Kirby Nagelhout Construction Company
Architect- BBT Architects– Bend, OR
Delta AV Systems was chosen to design and provide the installation/ integration of the AV systems for the new Clear Choice headquarters in Bend Or. This four-story LEED Gold Certified building included a high tech boardroom, several training rooms and a flex-space cafeteria. Delta was contracted as part of the construction team and the design scope of work included developing the AV design from initial concept, coordination with the Architects and electrical engineers and development of all drawings, device selections and budgets.
The AV systems installed included a boardroom with audio conferencing, wide screen projection, an automated control system with a wireless control panel, an interactive electronic whiteboard and a sophisticated sound system for support of the conferencing and media playback. There are also several training rooms with projection systems, automated control systems and audio systems. And finally, a flexible use cafeteria with a sound system for larger assemblies.
Delta AV provided all of the staff for design and project engineering, Crestron and Extron programming, project management, field supervision and installation with licensed technicians. Warranty support includes a one year, onsite support for all Delta workmanship and for devices provided by Delta AV Systems.
Delta Personnel for the Clear Choice Medical Headquarters Project:
Systems Designer – Jeff Overbo
Project Manager –Scott Oddson
Project Engineer – Craig Conner
Field Foremen – Hank Morton
Crestron & DSP Programmer- John Shaferley
Commissioning Team- John Shaferley, Scott Oddson
|